CHANNELSEA RIVER, WATERWORKS RIVER and BOW BACK RIVER
Content to be added.
Content to be added.
To view an entry please click on the thumbnail, which will open the photograph in a new window.
rnAll photographs are the copyright of their respective owners. Please do not download or copy any photograph without the owner’s permission.
rnrn
rnPhoto 1: Caledonian lunchbreak – Andy Clarke
rnrn
PCC NOTES ON VISITING THAMES CREEKS
rnrn
BELL LANE CREEK and RIVER WANDLE
rnrn
The creek is best tackled on a rising tide. The journey from Limehouse takes around one hour. High water at Bell Lane Creek is 30 minutes after High Water London Bridge. The creek is accessible for around 2 hours either side of high water. The optimum time to leave Limehouse is 2Y2 hours before High Water at London Bridge. This ensures adequate
Content to be added.
SPCC NOTES ON VISITING THAMES CREEKS
rnrn
DARTFORD AND CRAYFORD NAVIGATIONS
rnrn
The key to a successful visit to the Dartford and Crayford Navigations is the use of the tide. The Creek experiences high and low water approximately 45 minutes before London Bridge. (The Thames Barrier tide is 20 minutes prior to London Bridge). For simplicity this summary works on tide times at London Bridge. However, please remember the further
Content to be added.
To view an entry please click on the thumbnail, which will open the photograph in a new window.
rnAll photographs are the copyright of their respective owners. Please do not download or copy any photograph without the owner’s permission.
rnrn
rnPhoto 01: Peace at Last by John Serocold
rnrn